Archives » Kirkcaldy Promenade Works

Prom Once More

Access is now cut off to the whole of the prom. These two photos are from early March showing more drilling out of the old sea wall and the stumps of the metal supporting struts that strengthened it. Not to mention a demolished lamp standard.

Latest from Kirkcaldy Promenade

Latest phase of work. Drilling out the old wall on the north part of the Prom. Taken 19/2/14.

This second one was today. Top mostly drilled out.

Promenade Latest

This is the result of the drilling through the concrete groyne I posted about on 10/12/13. They drilled through two of the groynes, presumably to allow JCB/lorry access all the way along the beach. There doesn’t seem to have been much more work done in January since I took this on Jan 6th.

free hit counter script